Finite Capacity Scheduling
Control every second of your production. Optimize setups, respect complex constraints, and synchronize delivery dates with real machine availability.
Fine-Tuned Setup Control
Handle complex setup matrices based on color, material, or tool changes. Seed APS automatically resequences orders to minimize changeover times and maximize throughput.
Operational Constraints
Define machine-specific rules, labor availability, and maintenance stops. Your schedule will always respect the reality of your equipment and workforce.
Date Visibility & Sync
Get absolute clarity on Sales Order and Production Order dates. Sync upstream and downstream operations to ensure that every stage of the process meets the promised delivery.
Gestão de Capacidade e Horas Extras
Manage planned stops, unplanned breakdowns, and simulate overtime scenarios to recover delays and meet peak demand.
Why Scheduling Matters
Setup Reduction
Reduce machine downtime by optimizing the order of production based on technical attributes.
Total Visibility
Know exactly when each order will finish, allowing sales to provide accurate lead times.
Asset Optimization
Ensure your most critical resources are always working on the highest priority tasks.